In a hotel the first room is not a room, it is a mock-up. It is built complete, reviewed by the client and the operator, and only once it is signed off does the rest of the floor go into production. This set follows that path from structure to finished room.

The site frames show walls being set out against a green laser line and a facade wrapped in scaffold. The finished rooms are warm and contemporary: oak-look plank flooring, upholstered platform beds, a backlit niche behind the headboard, sheers with blackout drapes and a slim black-framed mirror.

The bathrooms are stone-effect porcelain with frameless glass showers, undermount basins in stone vanity tops and, in one suite, a marble-clad tub. The waterproofing underneath appears in none of these photographs and decides whether the room still looks like this in five years.

Open any photo to see it full size.

  • Voco Sharjah: from mock-up room to a finished floor — photo 2 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 3 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 4 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 5 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 6 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 7 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 8 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 9 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 10 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 11 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 12 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 13 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 14 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 15 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 16 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 17 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 18 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 19 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 20 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 21 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 22 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 23 of 24
  • Voco Sharjah: from mock-up room to a finished floor — photo 24 of 24