Ferrari World: phased EIFS cladding, plus a themed cart
Published

An EIFS cladding package to the underside and perimeter walls of the service decks, delivered in sequenced phases. The photographs show modular scaffold towers erected against structural concrete and steel soffits, mineral-wool boards being pinned, and louvre and shutter openings being dressed.
The 'after' frames are the ones that earn their place: painted walls, sealed floors, fresh yellow line-marking and no scaffold in sight. The difference from the first phase only reads when the two photographs sit side by side.
A separate group covers a themed retail cart with cast columns, an arched pergola and terracotta roof tiles, and an office where a curved gloss-red reception counter is being assembled.
Project photographs
Open any photo to see it full size.























