A pure civils job: a treated sewage effluent tank, followed from excavation to reinforced concrete structure. The sequence starts with a tracked excavator and tipper haulage, moves through breaking out rock with a hydraulic breaker, and then setting out and starter bars.

The headline frame is the tank base covered in hundreds of vertical bars, with steel formwork panels and access scaffold around it. Facing it: crawler cranes and a queue of mixer trucks with the discharge chute in the foreground.

There is not a single finish here. A water-retaining structure is judged on its concrete, its steel and its construction joints — and those are either right, or they leak.

Apri una foto per vederla a dimensione intera.

  • TSE tank: from excavation to a forest of rebar — foto 2 di 13
  • TSE tank: from excavation to a forest of rebar — foto 3 di 13
  • TSE tank: from excavation to a forest of rebar — foto 4 di 13
  • TSE tank: from excavation to a forest of rebar — foto 5 di 13
  • TSE tank: from excavation to a forest of rebar — foto 6 di 13
  • TSE tank: from excavation to a forest of rebar — foto 7 di 13
  • TSE tank: from excavation to a forest of rebar — foto 8 di 13
  • TSE tank: from excavation to a forest of rebar — foto 9 di 13
  • TSE tank: from excavation to a forest of rebar — foto 10 di 13
  • TSE tank: from excavation to a forest of rebar — foto 11 di 13
  • TSE tank: from excavation to a forest of rebar — foto 12 di 13
  • TSE tank: from excavation to a forest of rebar — foto 13 di 13